Ultimaker 2: Difference between revisions
Jump to navigation
Jump to search
→Machine Log: update for work done this week.
(→Status: Updated based on work done this week.) |
(→Machine Log: update for work done this week.) |
||
Line 37: | Line 37: | ||
!Notes | !Notes | ||
!Entry By | !Entry By | ||
|- | |||
|May 24, 2017 | |||
|Replace the X-axis zero-stop switch. (Used an M3 tap to thread holes in replacement switch Rana provided.) Also re-positioned X-axis stepper motor, to get more tension on that belt. | |||
|Allen | |||
|- | |- | ||