Ultimaker 2

From Hacklab.TO Public Wiki
Revision as of 01:42, 30 June 2014 by F3ndot (talk | contribs)
Jump to navigation Jump to search

This page documents Ultimaker #2 (Fawkes) [A phoenix from the ashes]

Ultimaker #2, also known as "Fawkes"

Status

  • The ultimaker has been non-functional since 'day 1'. It was a donation to the lab in a semi-built, non functional state.
  • Rebuild currently lead by aonomus/Norm

Machine Log

Date Notes Entry By
July 28, 2013 Found new Arduino mega and installed marlin firmware via CURA. Checked all axis movements, checked thermocouple via external temperature sensors and finalized hot-end. Installed build platform. Removed raspberry pi. Norm
July 27, 2013 Cemented thermocouple into tube, fit tube into hot end. Attempted firmware uploads using Cura (failed) and Xloader (succeeded) Norm
June 23, 2013 Machined remaining parts and assembled feeder, mounted and tested (dry run without power, tensioner only).

Attached flying lead ends of thermocouple onto thermocouple amp.
Wired in thermocouple amp, wired in feeder wiring.

Norm
June 22, 2013 Printed out and assembled most of the feeder, lubricated gantry. Norm
June 18, 2013 Printed out parts for feeder Norm
June 10, 2013 Stripped apart old filament feeder and began building new feeder which uses the hobbed pulley. Parts on order, machined other parts. Norm
June 8, 2013 Rebuilt hot-end, rebuilt gantry components, mounted entire gantry, roughly aligned belts, verified general mechanical functions!

Finished mounts for build platform (cutting build platform and mounting to be completed).

Norm
May 29, 2013 Boden tube, V2 hot end components, and belts arrived. Norm
May 16, 2013 Ordered Boden tube and V2 hot end components (the feeder upgrade can be printed for cheap). Belts ordered for Ultimaker 1 (when they are needed for replacement). (~$138) Norm
May 15, 2013 Printed Z home switch adjustment block and holder.

Designed and printed parts for new build platform system.
Disassembled Z axis, examined and attempted to straighten leadscrew (limited success), inserted main portion of the build platform innards.

Norm
April 29, 2013 Printed fourth X/Y bushing block and Raspberry Pi bracket Norm
April 27, 2013 Assembled 3/4 X/Y bushing blocks, 4th print failed mid-print. Norm
April 24, 2013 Unmounted dual extruder.

Stripped out X/Y gantry parts for rebuild (X/Y blocks broken).
Observed Z acme rod bent.
Remounted Arduino Mega and driver board.

Norm
April 22, 2013 Reorganized shelf to accommodate the Ultimaker, organized materials and supplies. Norm

To Do List

  • Repairs
    • Finish to-do list/upgrade list
    • Reprint X/Y bushing blocks, remount
    • Print tensioners, install
    • Print new extruder in entirety, mount
    • Print Raspberry Pi mounting plate, mount pi, wire up
    • Straighten Z axis acme rod
    • Crimp cable going to print head
    • Remount X/Y gantry system
    • Order hot end
    • Order boden cable
    • Order extruder (dependent on success of printable extruder)
    • Flash firmware
    • Calibrate endstops
  • Printable Upgrades
    • Spool holder
    • Magnetically attached print bed
    • Motor mounts
    • Fan cowling
    • Z axis home switch adjuster
    • Axis end-caps